EV road-trip DC fast-charging stop planner
Compare 70%, 80%, and 90% stop ceilings to estimate driving range between stops and the fastest modeled door-to-door time.
Results
- Fastest modeled trip
- 10 h 40 min
- Charging stops
- 2
- Later stop interval
- 200.9 mi
- First leg
- 218.2 mi
- Driving time
- 9 h 32 min
- Time connected to charger
- 52 min
- Total time at stops
- 1 h 8 min
- Energy added en route
- 120.6 kWh
- Modeled departure charge
- 88.3%
- Destination charge
- 10%
Intervals assume suitable chargers at the modeled positions. Check actual locations, access, and live status before leaving.
| Ceiling | Stops | Door to door |
|---|---|---|
| 70% | 3 | 10 h 47 min |
| 80% | 3 | 10 h 47 min |
| 90% | 2 | 10 h 40 min |
Worksheet inputs
- Trip distance
- 620 mi
- Highway energy use
- 300 Wh/mi
- Usable battery
- 77 kWh
- Starting charge
- 95 %
- Arrival reserve at each stop
- 10 %
- Maximum departure charge
- 90%
- Effective peak DC charger power
- 150 kW
- Power at 100% charge
- 15 % of peak
- DC charging efficiency
- 95 %
- Average driving speed
- 65 mph
- Overhead per charging stop
- 8 min
Calculation notes
The first leg uses available charge down to the reserve. Each later stop arrives at the reserve and adds an equal share of the remaining energy. The final destination also keeps the reserve.
For each ceiling, the comparison uses the minimum number of stops that fits. The optimizer also tries extra stops through the first count that avoids charging above 80%, then chooses the fastest pattern allowed by your selected ceiling.
The model assumes chargers can be placed where you need them and deliver the same effective peak power. Check actual stations, compatibility, spacing, traffic, and backup chargers when planning a real drive.
Frequently asked questions
When can a third EV charging stop make a road trip faster?
A third stop can save time when it replaces slow high-charge taper with shorter low-charge sessions. The time saved must exceed the extra stop overhead.
Why can departure charge be below the ceiling I chose?
The ceiling sets the maximum. The planner adds the energy needed to finish the trip and divides it evenly among the modeled stops.
Where can I find the actual chargers for the modeled intervals?
Use a station map and check connector, station status, and backup options. The distances on this worksheet are targets for comparison.