375-mile trip on a 50 kW fast-charging corridor

Several sites on the planned corridor can supply 50 kW. The vehicle uses 320 Wh per mile, starts at 85%, and caps charging at 70%.

Double effective charging power to test the time benefit if a future route has faster equipment.

Inputs

Unit system

Results

Fastest modeled trip
7 h 32 min
Charging stops
2
Later stop interval
105.5 mi
Battery charge along the route
Road trip state of charge2 modeled charging stops over 375 mi.Battery charge (%)Trip distance (mi)0025945018875281100375Reserve
First leg
164.1 mi
Driving time
5 h 46 min
Time connected to charger
1 h 30 min
Total time at stops
1 h 46 min
Energy added en route
67.5 kWh
Modeled departure charge
58.2%
Destination charge
10%

Intervals assume suitable chargers at the modeled positions. Check actual locations, access, and live status before leaving.

Minimum-stop patterns by ceiling
CeilingStopsDoor to door
70%27 h 32 min
80% (above limit)27 h 32 min
90% (above limit)27 h 32 min

Calculation notes

The first leg uses available charge down to the reserve. Each later stop arrives at the reserve and adds an equal share of the remaining energy. The final destination also keeps the reserve.

For each ceiling, the comparison uses the minimum number of stops that fits. The optimizer also tries extra stops through the first count that avoids charging above 80%, then chooses the fastest pattern allowed by your selected ceiling.

The model assumes chargers can be placed where you need them and deliver the same effective peak power. Check actual stations, compatibility, spacing, traffic, and backup chargers when planning a real drive.

Frequently asked questions

How much time is spent actually charging on the 50 kW trip?

At 90% efficiency the battery gains energy at 45 kW. The 67.5 kWh required takes 90 minutes across both stops.

Would doubling the corridor charger power halve the full trip time?

It would halve the charging portion in this constant-power example. Driving time and stop overhead stay the same.