Several sites on the planned corridor can supply 50 kW. The vehicle uses 320 Wh per mile, starts at 85%, and caps charging at 70%.
Double effective charging power to test the time benefit if a future route has faster equipment.
Results
- Fastest modeled trip
- 7 h 32 min
- Charging stops
- 2
- Later stop interval
- 105.5 mi
- First leg
- 164.1 mi
- Driving time
- 5 h 46 min
- Time connected to charger
- 1 h 30 min
- Total time at stops
- 1 h 46 min
- Energy added en route
- 67.5 kWh
- Modeled departure charge
- 58.2%
- Destination charge
- 10%
Intervals assume suitable chargers at the modeled positions. Check actual locations, access, and live status before leaving.
| Ceiling | Stops | Door to door |
|---|---|---|
| 70% | 2 | 7 h 32 min |
| 80% (above limit) | 2 | 7 h 32 min |
| 90% (above limit) | 2 | 7 h 32 min |
Worksheet inputs
- Trip distance
- 375 mi
- Highway energy use
- 320 Wh/mi
- Usable battery
- 70 kWh
- Starting charge
- 85 %
- Arrival reserve at each stop
- 10 %
- Maximum departure charge
- 70%
- Effective peak DC charger power
- 50 kW
- Power at 100% charge
- 15 % of peak
- DC charging efficiency
- 90 %
- Average driving speed
- 65 mph
- Overhead per charging stop
- 8 min
Calculation notes
The first leg uses available charge down to the reserve. Each later stop arrives at the reserve and adds an equal share of the remaining energy. The final destination also keeps the reserve.
For each ceiling, the comparison uses the minimum number of stops that fits. The optimizer also tries extra stops through the first count that avoids charging above 80%, then chooses the fastest pattern allowed by your selected ceiling.
The model assumes chargers can be placed where you need them and deliver the same effective peak power. Check actual stations, compatibility, spacing, traffic, and backup chargers when planning a real drive.
Frequently asked questions
How much time is spent actually charging on the 50 kW trip?
At 90% efficiency the battery gains energy at 45 kW. The 67.5 kWh required takes 90 minutes across both stops.
Would doubling the corridor charger power halve the full trip time?
It would halve the charging portion in this constant-power example. Driving time and stop overhead stay the same.