Multi-EV charger load-sharing and panel headroom calculator
Screen shared current, power per active EV, overnight energy per vehicle, and continuous-load headroom for two to eight EVs.
Results
- Overnight energy per EV
- 33.7 kWh
- Power per active EV
- 4.16 kW
- Active ports at once
- 3 / 3
- Power per EV when all run
- 4.16 kW
- Overnight range per EV
- 104.5 mi
- Screened continuous EV budget
- 52 A
- Applied total charging current
- 52 A
- Headroom at configured limit
- -10 A
- Headroom with applied load
- 0 A
- Headroom if all ports use maximum
- -85 A
The configured EV limit exceeds the screened headroom. Results apply the lower service budget.
Worksheet inputs
- Service or panel rating
- 200 A
- Existing non-EV design load
- 135 A
- Connected EVs or EVSE ports
- 3
- Maximum charging current per port
- 40 A
- Configured site charging limit
- 60 A
- Single-phase line-to-line voltage
- 240 V
- Overnight dwell time
- 9 h
- Wall-to-battery efficiency
- 90 %
- Fleet driving efficiency
- 3.1 mi/kWh
Calculation notes
Subtract the existing non-EV design load from the service rating and divide by 1.25 to screen the new continuous EV charging budget. The applied site limit is also capped by the controller setting and connected port ratings.
If each port can receive at least the assumed 6 A minimum, all vehicles share the current at once. Otherwise, the calculator estimates rotating groups of active ports with equal dwell time over the night.
This is a conservative single-phase planning check. Use a qualified designer for the adopted load calculation, listed energy-management equipment, branch circuits, and phase balancing.
Frequently asked questions
How is panel headroom estimated for a shared EV charger group?
The screening budget is panel rating less non-EV design load, divided by 1.25. The site setting or the sum of the port limits can reduce it further.
Why can some vehicles have zero simultaneous charging power?
When the budget falls below 6 A per connected EV, the model rotates among fewer active ports. Each connected EV receives its share of the total energy over the dwell period.
Can a controller make more home charging capacity available?
A compatible controller can throttle charging as building load changes. Enter the planned ceiling and use the calculated design load for this screening check.