Adding a second EV when panel headroom is already exhausted
The estimated existing design load is 102 A on a 100 A service before adding EV charging. Check the result before selecting two charging ports.
Test a professionally verified lower existing design load to see how much continuous charging capacity it would free.
Results
- Overnight energy per EV
- 0 kWh
- Power per active EV
- 0 kW
- Active ports at once
- 0 / 2
- Power per EV when all run
- 0 kW
- Overnight range per EV
- 0 mi
- Screened continuous EV budget
- 0 A
- Applied total charging current
- 0 A
- Headroom at configured limit
- -42 A
- Headroom with applied load
- -2 A
- Headroom if all ports use maximum
- -82 A
There is no screened headroom for added EV load. Confirm the service load with a qualified electrician.
Worksheet inputs
- Service or panel rating
- 100 A
- Existing non-EV design load
- 102 A
- Connected EVs or EVSE ports
- 2
- Maximum charging current per port
- 32 A
- Configured site charging limit
- 32 A
- Single-phase line-to-line voltage
- 240 V
- Overnight dwell time
- 9 h
- Wall-to-battery efficiency
- 90 %
- Fleet driving efficiency
- 3.1 mi/kWh
Calculation notes
Subtract the existing non-EV design load from the service rating and divide by 1.25 to screen the new continuous EV charging budget. The applied site limit is also capped by the controller setting and connected port ratings.
If each port can receive at least the assumed 6 A minimum, all vehicles share the current at once. Otherwise, the calculator estimates rotating groups of active ports with equal dwell time over the night.
This is a conservative single-phase planning check. Use a qualified designer for the adopted load calculation, listed energy-management equipment, branch circuits, and phase balancing.
Frequently asked questions
Why is overnight energy zero when the panel is already at its limit?
The estimated existing load exceeds the rating, so the conservative calculation assigns zero EV charging current.
What information helps reassess the second-EV project?