Six fleet charging ports on a 208 volt supply

A fleet estimates a 175 A non-EV design load against a 300 A panel. Six vans have ten hours parked and share a 100 A charging setting.

Change average dwell time to reflect a late-returning shift and compare the daily energy delivered.

Inputs

Unit system

Results

Overnight energy per EV
31.2 kWh
Power per active EV
3.47 kW
Active ports at once
6 / 6
Electrical load and remaining headroom
Managed EV service load6 of 6 EVs can charge at the same time at the screened site limit.Modeled panel demand (A)Service 300 AExisting 175 AEV load × 1.25 125 AConnected EVs1234566 active at once16.7 A per active port
Power per EV when all run
3.47 kW
Overnight range per EV
96.7 mi
Screened continuous EV budget
100 A
Applied total charging current
100 A
Headroom at configured limit
0 A
Headroom with applied load
0 A
Headroom if all ports use maximum
-115 A

The configured EV limit fits this conservative continuous-load screen.

Calculation notes

Subtract the existing non-EV design load from the service rating and divide by 1.25 to screen the new continuous EV charging budget. The applied site limit is also capped by the controller setting and connected port ratings.

If each port can receive at least the assumed 6 A minimum, all vehicles share the current at once. Otherwise, the calculator estimates rotating groups of active ports with equal dwell time over the night.

This is a conservative single-phase planning check. Use a qualified designer for the adopted load calculation, listed energy-management equipment, branch circuits, and phase balancing.

Frequently asked questions

What total power does 100 A provide at 208 V in this worksheet?

For the modeled single-phase calculation, it supplies 20.8 kW before charging losses.

How much energy per van does the 208 V depot deliver overnight?

20.8 kW for ten hours at 90% efficiency, shared by six vans, gives 31.2 kWh per van.