Two EVs sharing a 100 amp home panel

A household has an estimated 65 A of existing design load on a 100 A panel. Two 32 A ports share the remaining conservative budget for an eight-hour night.

Change the existing load to compare the effect of a new appliance or an updated load calculation.

Inputs

Unit system

Results

Overnight energy per EV
24.2 kWh
Power per active EV
3.36 kW
Active ports at once
2 / 2
Electrical load and remaining headroom
Managed EV service load2 of 2 EVs can charge at the same time at the screened site limit.Modeled panel demand (A)Service 100 AExisting 65 AEV load × 1.25 35 AConnected EVs122 active at once14 A per active port
Power per EV when all run
3.36 kW
Overnight range per EV
75 mi
Screened continuous EV budget
28 A
Applied total charging current
28 A
Headroom at configured limit
-5 A
Headroom with applied load
0 A
Headroom if all ports use maximum
-45 A

The configured EV limit exceeds the screened headroom. Results apply the lower service budget.

Calculation notes

Subtract the existing non-EV design load from the service rating and divide by 1.25 to screen the new continuous EV charging budget. The applied site limit is also capped by the controller setting and connected port ratings.

If each port can receive at least the assumed 6 A minimum, all vehicles share the current at once. Otherwise, the calculator estimates rotating groups of active ports with equal dwell time over the night.

This is a conservative single-phase planning check. Use a qualified designer for the adopted load calculation, listed energy-management equipment, branch circuits, and phase balancing.

Frequently asked questions

What does each EV get while both charge on the 100 A panel example?

The 35 A design headroom screens at 28 A of continuous EV charging. Each connected car gets 14 A.

How much energy does each car receive over eight hours?

At 240 V, 14 A is 3.36 kW. Eight hours at 90% charging efficiency puts about 24.2 kWh into each battery.